We always have projects that need completed all around the property. But we also have a lot that we have accomplished.
Listed on this link is our projects for the upcoming Spring cleanup:
Completed Projects
- Sidewalk Repair Lodge (2015)
- Lodge Roof Replaced (2017)
- Shed Built (2017)
- 100yrd target added (2018)
- Landscaping Lodge (2017)
- Playground additions (2015&2018)
- New lodge windows
- Walking Bridge Replacements (2016)
- Ox Roast Cooker rebuilt (2017)
- Pistol Range Additions
- Apartment remodeled (2015)
- Women’s room remodeled (2018)
- Bathroom floors refinished (2015)
- Kitchen remodeled (2016)
- Trap house stained (2018)
- Outdoor kitchen updated
Upcoming Projects
- Driving bridge replacement
- Lodge floor resurfaced
- 100yrd house rehabilitated
- Pistol/Muzzleloader range repaired
- Steel plate range reset
- White stripes painted inside
- Steps fixed to 100yrd range